data and information on building and cutting school funds .. The state School Building structures
57% of institutions do not have the certificate of fitness for use static
the 36.10% does not have the electrical system;
the barriers has 29.67% architecture;
57.4% of school buildings has no certificate of viability health
90% has inputs that do not have adequate safety standards;
91% has no entry for People with Disabilities;
in 70% of cases, there are non-slip treads;
only 36% was installed the panic hardware;
in a school of 5 escape routes are not adequately reported;
3 has only one school on fire escapes.
73.21% of the schools is not holding a certificate of fire prevention
(Note: Based on data from the FLC CGIL MIUR)
Maintenance of school buildings
• The 33.12% of the buildings in need of maintenance urgent;
• The 53.14% of the buildings has enjoyed the last five years of maintenance
(Note: Based on data FLC CGIL MIUR and Lega Ambiente)
The age of school buildings
• The 3.31% was built before 1900;
• The 17.61% was built between 1900 and 1940;
• The 28.05% was built between 1940 and 1996;
• The 45.92% was built between 1965 and 1990;
• The 5.11% was built between 1990 and 2002.
(Note: processing of MIUR data on FLC CGIL and the Environmental League)
Other conditions of school buildings
• 11% degli istituti sono collocati in strutture nate con altre destinazioni d’uso;
• L’8,30% degli edifici scolastici sono in affitto;
• Il 33,71% degli edifici si trovano in zone con rischio sismico;
• Il 16,38% degli istituti vi sono strutture con amianto;
• Nel 3,33% degli istituti vi è il sospetto della presenza di amianto;
• L’8,93% ha subito bonifiche da amianto negli ultimi due anni;
• Nello 0,22% è stata riscontrata la presenza di strutture con radon;
• Il 15,72 degli istituti sono ubicati vicino alle antenne emittenti radio televisione;
• Il 6,05% si trova in prossimità di elettrodotti High and low voltage section;
• The 12.90% are in the vicinity of industrial areas;
• The 1, 83 & is located near military facilities;
• The 1, 21% are close to airports
(Note : Based on data FLC CGIL MIUR and Lega Ambiente)
financial resources on building schools
The framework law on subsidized school (or law Masini L. 23/93) grants to provinces and municipalities the responsibility for supply, construction, routine maintenance and repairs (including the upgrading and retrofitting) of buildings for school use as well as supplies (water, electricity, gas, telephone, heating) with related equipment and furniture costs.
The law, in order to improve the school building at the national level, participation of the State lent its support to the regions through the allocation of specific funds. These loans are provided in the form of loans turn them on at the Cash DD.PP. with the total amortization paid by the State and are allocated through three-year plans of programming. From
L. 23/96 have been allocated:
• First three-year period 1996 -1998 a total of 1,569 million lire in the first year to 456 billion, 522 billion for the second year; Milardi 591 for the third year;
• Second period 1999/2001 a total of 1.395 trillion lire, of which 385 billion for the first year, 398 billion for the second year and 612 billion for the third year;
• In 2002, no resources have been allocated
• In the third period 2003/2005 has been allocated a total € 461,916,248 to 112,600,641 of which € for 2003 and € 348,915,607 for 2004, for the year 2005 there will be no funding.
• Can not figure out what will happen for the 2006-2008 period because to date, starting from 2005, was not allocated even one euro. And in the 2008 Budget for the time was not included anything about.